Gold Terra - waiting Drill result 2020

In this Phase 1 drilling program, the Company has completed 10 holes totaling 5,743 metres to test the depth extension of the Crestaurum deposit
All four holes intersected the Crestaurum shear with mixed results. The best intersection was 6.81 g/t over 1.4 metres in hole GTCR20-092. These four widely spaced holes (approx. 150 metres) tested a strike length of approximately 600 metres at a vertical depth of 400 metres. The alteration and mineralization observed in the intersected zones indicate the strong possibility of proximity to higher grade gold mineralization, which could be tested by closer spaced drilling.

last support 0.3
GoldpennystocksTrend Analysis

Мои профили:

Отказ от ответственности